关系到我国长江流域安全的长江重要堤防隐蔽工程,自1999年开工以来,在长江水利委员会长江重要堤防隐蔽工程建设管理局的领导下,经两岸建设大军的共同努力,已初战告捷,工程受到了国务院领导的表扬和勉励。回顾和总结这项重要水利工程的建设过程,对于进一步规范工程建设管理,提高水利工程施工质量,具有重要的现实意义。建设之初,为了保证勘测设计这一基础工作的顺利进行,长江委综勘局、水文局、长科院及湘、鄂、赣、皖4省有关部门共投入近3000人,驻扎在长江大堤上,终于在2000年汛前完成了主要项目的外业勘测工作。随后,长江委设计院共投入设计人员600余人,按时完成了32
Since the commencement of construction in 1999, under the leadership of the Great Dike Concealed Works Construction Authority of Yangtze River under the leadership of the Yangtze River Water Resources Commission and the concerted efforts of the army building on both sides of the Taiwan Strait, the concealed dam works for the major levees of the Yangtze River, which are related to the safety of the Yangtze River basin in our country, State Council leaders praise and encouragement. Reviewing and summarizing the construction process of this important water conservancy project has important practical significance for further standardizing the construction management of the project and improving the construction quality of the water conservancy project. At the beginning of construction, in order to ensure the smooth progress of the survey and design work, the Yangtze River Commission comprehensive survey Bureau, Bureau of Hydrology, Long Branch and the relevant departments of Hunan, Hubei, Jiangxi and Anhui provinces invested a total of nearly 3,000 people, stationed in the Yangtze River Levee Finally, the survey of the field of major projects was completed before the flood season of 2000. Subsequently, the Yangtze River Commission Design Institute invested a total of more than 600 designers, completed on time 32