论文部分内容阅读
1 Information of operationSPR is operated for 1 922.13 h in 2001, the reactor’s rated power is 3.5 MW, and the totalreleased energy is 280.311 MWd. Times of reactor’s operation and non-plan shut-down are 11 and 42, respectively. Primary loop water’s pH and resistivity is 5.9 and 71.5 × 104 Ω ·cm, respectively; maintaining pool water’s pile and resisting is 6.5 and 25 × 104 Ω · cm, respectively. The exhausted gas waste is 2.287 2× 107m3, e.g. 0.370 88 TBq for 2.1Ar. Radioactive liquid waste is 21.9 m3, e.g. 0.123 86 GBq.
Times of reactor’s operation and non-plan shut-down are 11 and 42, respectively. Primary loop water’s pH and resistivity are 5.9 and 71.5 × 104 Ω · cm, respectively; maintaining pool water’s pile and resisting is 6.5 and 25 × 104 Ω · cm, respectively. The exhausted gas waste is 2.287 2 × 107m3, eg 0.370 88 TBq for 2.1Ar Radioactive liquid waste is 21.9 m3, eg 0.123 86 GBq.