论文部分内容阅读
1998年1月,重钢3#高炉大修后,对高炉、热风炉和炉后使用计算机控制,并引进美国INTER公司开发的PARA500工控软件,使操作更方便、准确,为以后的模型控制打下了坚实的基础.就重钢3#高炉的计算机控制系统从工艺的角度给予初步分析.
In 1998 January, heavy steel 3 # blast furnace overhaul, the blast furnace, hot stove and furnace after the use of computer control, and the introduction of the United States INTER PARA500 developed industrial control software to make the operation more convenient and accurate for future model control laid solid foundation. On the steel 3 # blast furnace computer control system from the perspective of the process to give a preliminary analysis.