随着电网调度综合自动化技术的发展,越来越多的变电站实行了无人值班,变电站实行无值班后,调度、监控运行人员对远动系统的依赖性越来越强。特别是电压无功优化控制系统通过自动调整有载调压变压器抽头,投切电容器、电抗器组等。集控中心的运行人员也要通过后台监控系统对开关进行遥控操作,所以说遥控的正确执行对电网安全运行起到至关重要的作用。
With the development of integrated dispatching automation technology, more and more substations have implemented unattended substations. After the substations have been put on standby, dispatching and monitoring of operators have become increasingly dependent on telecontrol systems. In particular, voltage and reactive power optimization control system by automatically adjusting the tap on-load tap-changers, switching capacitors, reactor groups. The operation personnel of the centralized control center also need to carry on the remote control operation of the switch through the background monitoring system, so that the correct implementation of the remote control plays a crucial role in the safe operation of the power grid.