案情简介1995年,某公司决定办钢铁厂一座。为了使工程尽快开工、投产,公司决定暂停其它工程,全力进行主体工程建设,待主体工程完工后再进行配套设施建设。1996年12月,N钢铁厂在防治污染设施未建成的情况下即投入生产。后来,防治污染设施虽然建成,但该厂为节省资金一直未启用,给当地的河流、空气
Brief introduction of the case In 1995, a company decided to set up a steel plant. In order to start the project as soon as possible, put into production, the company decided to suspend other projects, to carry out the main project construction, construction projects to be completed before the main ancillary facilities. In December 1996, N steel mill was put into production without any pollution control facilities being built. Later, although the pollution prevention and control facilities were completed, the plant has not been opened to save money, giving the local rivers, air