The capacity and size of hydro-generator units are increasing with the rapid development of hydroelectric enterprises,and the vibration of the powerhouse struct
Ice melt water from a 22.27 m ice core which was drilled from the East Rongbuk Glacicr,Mt.Everest was incubation in two incubation ways:plate melt water directl