论文部分内容阅读
我们2026钻机,自1972年10月建立以来,在毛主席革命路线指引下,在社会主义建设总路线光辉照耀下,在批林批孔运动的推动下,广大职工的阶级斗争和路线斗争觉悟不断提高,发展了革命、生产的大好形势。到1974年6月,共完成钻探工程量12,614米,完成施工计划的116%,钻月效率平均达到623米;竣工14个钻孔,在深孔煤系地层钻进中,钻孔全为甲级,达到质量全优;共见52层可采煤层,煤芯采取率平均达到91.5%;竣工钻孔孔深都在850米至990米,孔斜度都不超过规程规定;消灭了重大人身、孔内、机械事故;按定额比较。降低材料费10,912元。实现了优质、高效、安全、低耗,全面完成了任务。我们的基本作法是:
Since the establishment of our 2026 drilling rig in October 1972, under the guidance of Chairman Mao’s revolutionary line and under the brilliant shining of the general line of socialist construction, the general consciousness of class struggle and the line struggle among workers and staff has been steadily improved under the motto of " , Developed the great situation of revolution and production. By June 1974, a total of 12,614 meters of drilling projects were completed and 116% of the completion of construction plans were completed, with an average drilling efficiency of 623 meters. Completion of 14 boreholes was completed in deep-hole coal measures. Level, to achieve the best quality; a total of 52 layers of coal mining can be seen, the coal core to take an average rate of 91.5%; completed drilling hole depth of 850 meters to 990 meters, the hole slope does not exceed the rules and regulations; Personnel, holes, mechanical accidents; according to the quota comparison. Reduce material costs 10,912 yuan. To achieve high quality, high efficiency, safety, low consumption, fully completed the task. Our basic approach is: