浙江省“十一五”水路建设规划目标宏伟、任务艰巨。建设总投资377亿元,其中内河122亿元,沿海244亿元,陆岛交通11亿元,是“十五”期实际完成量的2.56倍。以下是对规划实施的几点思考。浙北航道网建设的体制与运行机制内河航道总体目标是“四建四提升”。四建:建设杭甬运河、湖嘉申线、杭平申线、钱塘江四条航道;四提升:提升京杭运河、杭申线、长湖申线、乍嘉苏线四条航道的等级。航道总里程约1000km,总投资约230亿元,总用地约2000公顷。实施四建四提升,首先应研究建设体制和运行机制。1.建设体制。“九五”期浙江开始大规模建设浙北内河航道网,彻底改变了浙江内河航道落后面貌,成效显著。当时既得益于国内率先利用世界银行贷款,同时也得益于有一个较好的领导体制,即成立分管副省长、各市分管副市长、省交通厅和各市交通局组成的领导小组及办公室,充分发挥了政府主导作用。航道项目是社会公益性基础项目,不能完全由市场来调节,“十一五”期如此繁重的任
Zhejiang Province, “Eleventh Five-Year” waterway construction planning grand goal, the task arduous. The total construction investment is 37.7 billion yuan, of which 12.2 billion yuan is inland water, 24.4 billion yuan in coastal areas and 1.1 billion yuan in landlocked traffic, which is 2.56 times of the actually completed amount in the “15th” period. The following is the planning of the implementation of a few ponders. The system and operation mechanism of Zhejiang North Channel network construction The overall goal of the inland waterway channel is “four build four upgrade ”. Four-build: The construction of Hangzhou-Ningbo Canal, Lake Jiashen line, Hangping line, Qiantang River four fairways; Fourth upgrade: to enhance the Beijing-Hangzhou Grand Canal, Hangzhou Shen line, the Yangtze River Shen line, Zhajiasu four routes fairway level. The total length of the waterway is about 1000km, with a total investment of about 23 billion yuan and a total land area of about 2000 hectares. To implement the four-four-rise, we should first study the construction system and operation mechanism. 1. Construction system. In the “95” period, Zhejiang began to build a large-scale network of river networks in northern Zhejiang and completely changed the backwardness of the inland waterway in Zhejiang Province. The results achieved notable results. At that time, both benefited from the first domestic use of the World Bank loan, but also benefited from a better leadership system, namely the establishment of vice governor in charge of the city in charge of deputy mayor, Provincial Communications Department and the municipal transport bureau leading group and office , Give full play to the leading role of government. Waterway project is a basic social welfare projects, can not be completely adjusted by the market, “Eleventh Five-Year ” period of such a heavy task