对武广客运专线试验段单元板式无砟轨道施工工序及现场实测资料进行了分析,提出了工料机消耗量测算方法,达到了为合理确定工程造价提供数据模块的目的。
The construction process of the unit slab ballastless track in the test section of Wuhan-Guangzhou Passenger Dedicated Line and the field measured data were analyzed. The calculation method of material consumption was put forward and the data module was provided to reasonably determine the project cost.