论文部分内容阅读
随着我国城市化进程的不断推进,城市轨道交通网络建设迎来了巨大的发展机遇和现实挑战。地铁工程项目成本管理工作涉及的要素较多,如何对各项成本因素有效管控成为了行业工作者们关注的重点。偏差分析法是当前工程建设领域应用较多的工程分析控制方法,通过在费用与进度之间建立有效的联系实现工程成本的分析,以此提出针对性的措施进行优化改善。本文探讨了偏差分析法在地铁工程项目成本管理中应用的相关内容,旨在提供一定的参考与借鉴。
With the continuous progress of urbanization in our country, the construction of urban rail transit network ushers in tremendous development opportunities and realistic challenges. Subway project cost management involves more elements, how to effectively control the cost of various factors become the focus of the industry workers. Deviation analysis method is the engineering analysis and control method, which is widely used in the field of engineering construction at present. Through the establishment of effective connection between cost and progress, the project cost analysis is carried out to propose the specific measures to optimize and improve. This article discusses the deviation analysis method in the subway project cost management application content, aims to provide some reference and reference.