槟城二桥主桥主塔横梁,主梁0#、1#节段,过渡墩横梁,边跨18#节段均采用落地现浇支架施工方法。针对该工程现浇段多、悬臂部分长、工期紧等难点,并结合现场实际情况,详细介绍了0#、1#块现浇支架的设计及施工工艺,并对施工中应注意的问题进行总结分析。实践证明此次现浇支架安全可靠,完全满足施工进度的要求。为槟城二桥主桥的顺利施工提供了重要的技术服务,也为同类工程现浇支架的设计及施工提供了参考。
The main beam of Main Bridge of Penang Second Bridge, the main girder 0 #, 1 # section, the transversal pier beam and the span of 18 # are all constructed by the cast-in-place construction method. In view of the difficulties of casting lots, long cantilever parts and tight construction period, the design and construction technology of cast-in-place 0 #, 1 # block are introduced in detail according to the actual situation in the field, and the problems that should be noticed in construction Analyzed. Practice has proved that the cast-in-place stent safe and reliable, fully meet the requirements of the construction schedule. It provided an important technical service for the smooth construction of the main bridge of the Second Bridge in Penang and provided a reference for the design and construction of the cast-in-place support for similar projects.