北京同仁堂二期工程位于繁华的前门外大栅栏商业街上,是国内最大的中药店,仿古式建筑,地上四层,地下二层,框架结构。建筑位置以原同仁堂地界为基准,自大栅栏街中心线向南7.5m为新建红线,东临“张一元茶庄”,西临同仁堂夹道,与同仁堂一期工程相隔5m,由两座过街楼与一期工程连为一体,占地面积2100m~2,建筑面积10843m~2。由于该工程所在街道非常狭窄,建筑施工立塔极为困难,定型模板的尺寸较大、较重,施工中的支拆模板有很大困难。钢管圆柱支模不但可以解决这一难题,而且具有定型模板支拆方便、快
Beijing Tong Ren Tang Phase II Project is located in the bustling Qianmen Dashilan Commercial Street. It is the largest Chinese medicine shop in China, with antique architecture, four floors above ground, two underground floors, and a frame structure. The location of the building is based on the boundary of the original Tong Ren Tang. The new red line is 7.5m south of the center line of Dashilan Street. It is adjacent to the “Zhang Yiyuan Tea House” on the east. The Tongrentang Clipping Road is on the west. It is separated from the first phase of Tong Ren Tang by 5m. It consists of two buildings across the street. The first phase of the project is integrated with an area of 2100m~2 and a building area of 10843m~2. Since the street where the project is located is very narrow, it is extremely difficult to erect towers for building construction. The size of the formwork template is relatively large and heavy, and the support and dismantling template in construction is difficult. The cylindrical steel pipe mold can not only solve this problem, but also has convenient and quick installation and disassembly of the template.