(一) 本溪基建工区1958年承担了本溪鋼厂热电站三机四爐(3×25000瓩,4×130吨/时)的扩建任务。虽然劳动力少(全工区仅600多名員工,其中徒工和低級工占60%左右),施工机具缺乏,但没有强調困难。在党总支的領导下,深入的发动了羣众,克服了各种困难,从1958年第二季度开始施工到12月为止,已完成二机三爐的任务,有力地保証了鋼铁元帅用电的需要。在自力更生,制造施工机具这个关鍵問題上,我們做了一些工作。在党总支号召要自力更生,自己动手制造施工机
(a) The Benxi Infrastructure Construction Area undertook the expansion task of three boilers and four boilers (3×25,000 瓩, 4×130 tons/hour) in the thermal power plant of the Benxi Steel Works in 1958. Although the labor force is small (the entire work area has only 600 employees, of which apprentices and low-level workers account for about 60%), there is a lack of construction equipment, but no difficulties are emphasized. Under the leadership of the party general leadership, the masses were launched in depth and various difficulties were overcome. From the beginning of construction in the second quarter of 1958 to December, the tasks of two machines and three furnaces have been completed, effectively guaranteeing the Marshal of steel. Electricity needs. On the key issue of self-reliance and manufacturing of construction equipment, we did some work. Calling for self-reliance in the Party General Party’s call to create a construction machine