针对金华变电所一期工程投产时,遥测、遥信的传送时间不能满足设计要求这一情况,为满足相关调度中心对变电所和联络线监控的需要,保证福建与华东联网工程的顺利实施,对远动系统软件和数据流向进行了改造。在不改变原有硬件设备的基础上,采用修改软件、减少数据的中间处理环节、优化数据流向等措施,达到了提高实时性指标的目的。改造提高了遥测、遥信的响应速度,确保了福建与华东电网联网工程的顺利投运。
For Jinhua substation a project put into operation, telemetry, remote transmission time can not meet the design requirements of this situation, in order to meet the dispatch center of the substation and tie line monitoring needs to ensure that Fujian and East China network project smoothly Implementation, the remote system software and data flow has been transformed. On the basis of not changing the original hardware and equipment, adopting measures such as modifying software, reducing intermediate processing of data, optimizing data flow and so on, the goal of improving the real-time index is achieved. Improve the transformation of telemetry, remote response speed, to ensure that Fujian and East China Power Grid project put into operation smoothly.