论文部分内容阅读
详细介绍了豆坝发电厂 3、4号机组DCS系统改造工程和施工情况 ,为今后电力系统DCS改造中施工提供参考。
This paper introduces in detail the reconstruction and construction of DCS system of No.3 and No.4 units in Douba Power Plant and provides reference for the construction of power system DCS in the future.