论文部分内容阅读
将“h”型钢结构格构式跨越架施工的底座安装、架体组装、旋转臂安装、旋转臂封网作为监理控制的重点,通过对地基承载力计算、架体侧面风荷载、主索道(承力绳)选择、绝缘尼龙网的选择,以期为输电线路工程跨越重要设施施工监理提供参考。
The base of the “h” -shaped steel lattice structure span construction, the frame assembly, the installation of the rotating arm, the rotating arm sealing as the focus of supervision and control, through the foundation bearing capacity calculation, Ropeway (bearing rope) choice, the choice of nylon insulation, with a view to transmission lines project construction supervision over important facilities provide a reference.