论文部分内容阅读
九江市市委九届七次全会提出了“拉大城市框架,实现从甘棠湖、南湖时代走向八里湖时代”的城市总体发展战略部署,使医院迎来了新的历史性发展机遇:在八里湖新区建设一所医院——九江市第一人民医院八里湖分院。分院建设:按一次规划,三期实施。总用地面积133345m~2,总建筑面积132521m~2,开放病床970张,预计总投资4.2亿元人民币,力争一年一期工程竣工。八里湖分院由上海广申建筑设计有限公司设计,根据医院新址地形,医院整体设计方案的思路为主建筑群
The 7th Plenary Session of the 9th Municipal Party Committee of Jiujiang City put forward the strategy of “pulling the big cities, realizing the transition from the Ganzi Lake and the Nanhu Times to the Bali Lake Times” to enable the hospital to usher in a new historic development opportunity: Construction of a hospital in the Bali Lake District - Jiuli Lake Branch of the First People’s Hospital of Jiujiang City. Branch building: According to a plan, three phases of implementation. The total land area is 133345m~2, the total construction area is 132521m~2, and 970 open beds are expected. The total investment is expected to be 420 million yuan, and the first phase of the project will be completed. The Bali Lake Branch was designed by Shanghai Guang Shen Architecture Design Co., Ltd. According to the hospital’s new site topography, the overall design plan of the hospital is the main building group.