Max-Flow Problem in Undirected Planar Networks with Node Capacities Being in NC

来源 :计算机科学技术学报(英文版) | 被引量 : 0次 | 上传用户:ogl
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The max-flow problem in planar networks with only edge capacities has been proved to be in NC (Nickles Class). This paper considers a more general version of the problem when the nodes as well as the edges have capacities. In a general network, the node-edge-capacity problem can be easily reduced to the edge-capacity problem. But in the case of planar network this reduction may destroy the planarity, and reduces the problem to the edge-capacity problem in a general network, which is P-complete. A recent contribution presents a new reduction for planar networks, that maintains the planarity. In this paper, it is proved that this reduction is in NC and thus the node-edge-capacity problem in undirected planar networks is in NC.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
改革开放30年来,中国的对外贸易蓬勃发展,为中国经济增长做出了巨大的贡献,也引发了一系列的问题,比如:外汇储备规模过高,人民币升值压力加大、贸易摩擦不断加深等等。跨国公司直
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
高校共青团工作应以和谐社会建设和科学发展观学习实践活动为契机,以人为本,注重团员学生的社会主义核心价值体系的构建和自我价值的实现,加强团组织自身建设,增强服务意识,
在现实世界中,自然灾害和意外事故客观存在着,各种天灾人祸的风险始终存在于人类生活的方方面面,且随着经济和社会的不断发展,日益变得更加复杂。正因为风险的无处不在,所有的个人
The problem of efficiently monitoring the network flow is regarded as the problem to find out the minimum weighted weak vertex cover set for a given graph G = (
期刊
当前,干部选拔任用制度改革已进入攻坚克难的关键阶段,尚待改革的多是一些深层次的难点问题和关键环节。比如,干部岗位职责规范问题、初始提名权问题、干部工作中民意真实性
期刊