论文部分内容阅读
集宁地区作为张集线的接轨点,其接轨方案受地区内既有运营条件、城市规划、地形条件等诸多因素的影响。针对目前集宁地区站场的现状,通过多方案技术经济比选确定张集线引入集宁地区的最优方案,使运输及行车组织更加顺畅。
Jining area as a convergence point of Zhangji line, its program by the existing operating conditions within the region, urban planning, terrain conditions and many other factors. In view of the present situation of the station yard in Jining area, the optimal scheme of introducing the Zhangji line into Jining area is determined through the technical and economic comparison and selection of multiple programs so that the transportation and traffic organization can be smoothed smoothly.