襄樊港务局是一家新建的以中转煤炭为主的国有企业,现有职工280余人,设备56台套。港口工程于1990年10月正式开工,1994年8月竣工并投入试生产,1995年10月通过国家正式验收。港口设计煤炭年中转能力500万吨,两个煤炭装船泊位,建有一条长26公里长的铁路专用线,一个六股道的编组站,煤炭的卸、堆、取、运、装等生产程序全部自动化控制,大型模拟屏显示。是目前汉江上规模最大,现代化程度最高的煤炭专用港口。
Xiangfan Port Authority is a newly established state-owned enterprise based on transit coal, with more than 280 employees and 56 sets of equipment. Port project was officially started in October 1990, completed in August 1994 and put into trial production, in October 1995 by the state formal acceptance. Port design capacity of 5 million tons of coal transfer, two coal berths, built a 26 km long railway line, a six-legged marshalling yard, unloading, stacking, taking, transportation, equipment and other production All automatic control program, large-scale simulation screen display. It is now the largest and most modernized coal port on the Han River.