我们是怎样复查修改设计的

来源 :机械工厂设计 | 被引量 : 0次 | 上传用户:fairstone
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在全国工农业大跃进的形势下,电站设备的需要量增长很快,明年要新建的发电设备厂就有数十个之多。发电设备制造厂大都需要重型机床,明年建设的几十个厂就需要上千台的重型机床,如果全靠重型机床厂供应那是很困难的,从国外进口又为数有限,时间亦很长。工厂设计人员对待这个问题存在着两条道路,两个做法。一条是墨守成规照搬过去的设计方法,采用正规的重型机床,一切按高标准的做,这是一条少慢差费的道 Under the situation of the great leap forward of the national industrial and agricultural industry, the demand for power station equipment has grown rapidly. There will be dozens of power plant manufacturers to be built next year. Most power plant manufacturers need heavy-duty machine tools. Dozens of plants built next year will require thousands of heavy-duty machine tools. If they rely on heavy-duty machine tool factories to supply them, it is very difficult. There are only a few imports from foreign countries and the time is very long. Factory designers have two paths to deal with this problem, two approaches. One is a design method that sticks to the past and adopts a regular heavy machine tool. Everything is done in accordance with high standards. This is a way to save money.
其他文献
一九五三年冬修中由于我们注意了工程质量,使修堤防工程的质量得到了很大的提高。据一百五十次的硪实检验,三公寸坯头硪实一寸九的占百分之三十二点三,二寸的占百分之 In t
为了全面落实英明领袖华主席提出的抓纲治国的伟大战略决策,我省机械局于1977年7月10日至8月24日举办了省机械系统工模具热处理短训班。参加短训班的学员共33人。 In order
交工验收是基本建设的最后一个环节,它起着对建筑安装工程进行总检查以促使及时顺利投入生产的作用。1956年的交工验收工作由于缺乏经验准备工作不足,工作中存在混乱缓慢的
新西兰卡默伦·路伊斯公司(Messrs.J.Cameron Lewis Co.Ltd.)生产的一种叫做“Gnat”的微型三轮车,重量很轻,只有260磅,据称可在多石的干河床以至斜度达45°的陡坡上行驶。6
活塞是凿岩机的主要零件之一,又是凿岩机中最易损坏的零件。它在气缸中以很高的速度做往复和回转两种运动,频繁冲击钎杆并带动钎杆转动,承受着冲击和扭转载荷。它的质量好坏
一机部矿山机械键条质量攻关会于九月一日至七日在沈阳召开。沈阳链条厂等15个单位共30名代表到会。会议首先学习了毛主席的三项重要指示,学习了四届人大“政府工作报告”和
在我国伟大的农田水利建设事业中,应当作技术革命的闯将,还是当无所作为的庸人?这是我们每一个技术干部的革命人生观和世界观问题,也是知识分子思想改造的根 In the great
一九五一年为了适应新黄河建设的急需,在刻不容缓的任务面前,黄河水利学校(当时是黄河水利专科学校)也像全国其他专业一样,是以革命的姿态,克服困难的精神,正式成立了。三年
[法国《航空与宇宙》1977年4月30日报道]法国国家空间研究中心主任于贝尔·居里安最近与法国《航空与宇宙》周刊记者漫谈法国空间活动十五年取得的成就及其未来发展方向,现
“机械工厂设计”1957年第10期及第12期刊登了几篇关于改进设计计划工作的文章,我基本上同意“改进设计机构计划工作的两种不同意见”一文中的第二种意见,即:现行的计划管理