Collaborative supply chain planning under dynamic lot sizing costs with capacity decision

来源 :系统工程与电子技术(英文版) | 被引量 : 0次 | 上传用户:dtmark
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Studies show that supply chain cooperation improves supply chain performance. However, it remains a challenge to develop and implement the realistic supply chain cooperation scheme.We investigate a two-echelon supply chain planning problem with capacity acquisition decision under asymmetric cost and demand information. A simple negotiation-based coordination mechanism is developed to synchronize production/order strategies of a supplier and a buyer. The coordination scheme shows how the supplier and the buyer modify their production and order policy in order to find a joint economic lot sizing plan, which saves the overall supply chain cost. The allocation of the cooperation benefit is determined by negotiation. Due to the complexity of the multiple periods, multiple level supply chain lot sizing with capacity decision, a heuristic algorithm is developed to find coordination solutions. Finally, the results of the numerical study indicate the performance of supply chain coordination scheme.
其他文献
利用超声波法制备高质量CdTe半导体纳米晶体,采用该方法不仅降低了实验成本,简化了实验流程,而且还可制备出量子产率达到50%的CdTe纳米晶体,具有较好的光谱学性质,可用于莱姆
内点法是求解复杂优化问题的重要算法,对不等式约束的处理是影响算法性能的关键因素之一,更严苛的不等式约束标志着更好的优化指标和更差的收敛性。为缓解这种矛盾,提出一种按类
电网中存在的某些脆弱环节对系统大停电事故有着重要的影响。为了有效辨识出这些脆弱环节,提出了基于保护脆弱度加权拓扑模型下的脆弱性评估方法。定义了保护配合度、保护故障
Aimed at the difficulty in revealing the vibration localization mechanism of mistuned bladed disks by using simple non-linear model, a mechanical model of the b
一致性检验、修正和权值排序作为一个整体处理,属于全局分析方法.采用遗传算法优化建立的一致性指标系数函数,引入小生境技术以保证在待优化参数较多时仍能找到最优解.分析了
Mixed rare earth elements were incorporated into alumina ceramic materials. Hot-pressing was used to fabricate alumina matrix composites in nitrogen atmosphere
优化了模型DGM(1,1)的建模初始条件,讨论并证明了该模型与原始数据在升、降、凹、凸等几何形状方面的吻合性;最后通过算例验证了该模型的有效性及实用性;DGM(1,1)直接建模法对丰
The influence of each factor on the reaction of geopolymers material was investigated by using the orthogonal experimental design method, which got the optimal
The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies-Hence,problems to coordinate t