沙特新建日产水能力25万立方米的反渗透海水淡化厂

来源 :水处理技术 | 被引量 : 0次 | 上传用户:sakula617
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
2017年5月,西班牙能源巨头Abengoa对外宣布,将在位于沙特阿拉伯红海海岸的Shoaiba Ⅲ电厂与海水淡化厂综合体内新开发一座大型反渗透海水淡化厂。新建反渗透海水淡化厂设计日产水量为25万立方米,是目前Abengoa开发的最大规模的海水淡化项目。项目建成后,将使Shoaiba Ⅲ成为世界上最大的海水淡化厂综合体。其生产的可饮用水将供应给SWCC(沙特阿拉伯国家水务机关),向包括Makkah、Jeddah、 In May 2017, Spanish energy giant Abengoa announced that it will open a new large-scale reverse osmosis desalination plant at the Shoaiba III power plant and desalination plant in the Red Sea coast of Saudi Arabia. The new reverse osmosis desalination plant, designed to produce 250,000 cubic meters of water per day, is the largest desalination project currently being developed by Abengoa. When completed, the project will make Shoaiba III the largest complex of desalination plants in the world. The potable water it produces will be supplied to the SWCC (National Water Authority of Saudi Arabia) to include Makkah, Jeddah,
其他文献
目的:探讨正念癌症康复训练对乳腺癌化疗期间病人心理症状及躯体症状的影响.方法:对80例乳腺癌化疗患者进行选取,就诊时间均介于2019年4月~2020年4月,据随机数字抽取法进行组
介绍了迁西滦水湾公园景观整治工程的基本内容。针对城市河道传统硬质驳岸现状综合运用了新技术、新材料和新思维的设计和施工策略。设计遵照场地特性,从整体出发,兼顾河道行
目的:探析早期康复护理对脑出血患者术后生活质量与肢体功能恢复的影响.方法:随机选取我院2017年11月至2019年11月内收治的70例脑出血患者,所有患者随机分为参照组(35例、常
目的:分析急诊护理对心肌梗死患者抢救成功率以及预后的影响.方法:选取2018年10月—2019年10月我院收治的心肌梗死患者84例作为研究对象,根据患者护理差异分为观察组与对照组