结合平果右江双线特大桥(80+144+80)m连续梁中跨合拢段浇筑配重采用水箱配重,通过对水箱配重计算分析,指导现场中跨合拢段施工,取得了非常好的效果,保证了连续梁施工质量。
Combined with the counterweight of the continuous girder of the Pingguo Youjiang double-girded bridge (80 + 144 + 80) m, the weight of the water tank is used to calculate the counterweight of the continuous girder, and the construction of the mid-span confluence section is guided by the calculation of the counterweight of the water tank. Good effect, to ensure the quality of continuous beam construction.