论文部分内容阅读
大有乡大凌河入海口右岸转弯处严重淘刷崩岸,如不尽快对大凌河入海口右岸转弯处进行护岸治理,洪水对该处河岸的冲刷将越加严重,而且严重威胁东方华地城、天沐温泉度假村和锦州市龙海馨港旅游产业有限公司、大有温泉生态城的安全。对该段工程的基本情况进行了阐述,并对该河段的区域地质概貌、地质地层条件、水文地质条件及水环境与土的腐蚀性进行了分析,通过对该险工地段工程地质条件的分析可以得出该地段地层岩性条件良好,未发现断层,为抗震不利地段,地下水为松散岩类孔隙潜水,对钢筋混凝土结构中钢筋具中等腐蚀性,对钢结构具微腐蚀性,但不影响工程建设。
Daling Township, Daling River right bank turn right corner of the serious Amoy brush collapse collapse, if not as soon as possible on the right bank of the Daling River estuary turning Bento governance, floods on the banks of the erosion will be more serious, and a serious threat to the East China Sea Dacheng, day Mu Spa Resort and Jinzhou City, Long Haixin Hong Kong Tourism Industry Co., Ltd., a great spa eco-city security. The basic situation of this section of the project is described, and the regional geological overview of the river section, the geological formation conditions, hydrogeological conditions and water environment and soil corrosion were analyzed. By analyzing the engineering geological conditions of this section It can be concluded that the lithology condition of this lot is good, no fault is found, it is the unfavorable area for earthquake resistance, underground water is loose rock type pore diving, moderately corrosive to reinforcing steel in reinforced concrete structure, but not corrosive to steel structure Construction.