前言经过1973年以来的两次石油危机,日本钢铁工业在节能方面下了很大力量——以能源观点重新评价了从高炉作业到成品制造的全部生产工序,最近10年间每吨粗钢约节能4.2GJ 以上,如果按照目前约1亿 t 的粗钢生产规模来计算,则把这个能源节约量换算成石油时,相当于11GL。本文叙述在节能方面做出很大贡献的炼钢-热轧工序的直接联结技术的情况(图1)。当实行炼钢-热轧工序直接联结的时候,因为必须按照用户要求来提高成品质量,所以直接联结技术也必须达到相应的高度。
Foreword After two oil crises since 1973, the Japanese steel industry has made great efforts in saving energy - reevaluating all production processes from blast furnace operations to finished product manufacturing from the energy point of view, and saving energy per ton of crude steel in the recent 10 years 4.2GJ above, according to the current production of about 100 million tons of crude steel to calculate the size of this energy savings converted into oil, the equivalent of 11GL. This article describes the case of a direct steelmaking-hot-rolling process that makes a significant contribution to energy efficiency (Figure 1). When the steel-hot-rolling process is carried out directly, the quality of the finished product must be improved according to the user’s requirements, so the direct bonding technique must also reach the corresponding height.