论文部分内容阅读
诸暨万达广场工程变形缝宽度仅为100mm,在变形缝模板安装施工过程中,特别是变形缝两侧为双重剪力墙且墙长较长时,通用的模板支设施工工艺质量控制较难且施工复杂,本工程模板支设采用组拼式钢模板,灵巧、经济、安全地完成了剪力墙的施工。实践证明,其具有广泛的应用前景。
Zhuji Wanda Square project deformation gap width of only 100mm, in the deformation of the stencil installation and construction process, especially the deformation of the seam on both sides of the double shear wall and the wall length is longer, the common template construction quality control is more difficult and The construction is complicated. The project template is supported by the grouping steel template, and the construction of the shear wall is completed deftly, economically and safely. Practice has proved that it has a wide range of applications.