论文部分内容阅读
五强溪水电厂计算机监控系统从美国兰吉尔(L&G)公司引进,机旁无常规控制盘,中控室无常规控制操作装置,且与首台机组投产发电同步投运。该系统投运至今近三年来的运行实践证明是成功的。本文简要介绍了监控系统取得成功的若干经验。
The computer monitoring system of Wuqiangxi Hydropower Plant was introduced from Lange (L & G) Company in the United States. There was no conventional control panel near the machine and no control device in the control room. The unit was put into operation simultaneously with the first unit. The system put into operation nearly three years of operation proved to be successful. This article gives a brief overview of some of the successes of monitoring systems.