论文部分内容阅读
工程施工,是工程项目通过实施建设形成工程实物的重要过程,也是最终形成工程产品的重要阶段。因此,施工阶段的质量监理,是工程项目质量目标控制的主要环节和重点,也是施工监理的核心内容。施工阶段的质量监控一般分事前、事中和事后控制三阶段,其控制目标的多达20多项,具体监理内容繁杂、琐碎。如果总监
Project construction is an important process of engineering projects formed through the implementation of construction projects, but also the final stage of the formation of engineering products. Therefore, the quality supervision during the construction phase is the main link and emphasis of the project quality target control and also the core content of construction supervision. Quality control during the construction phase is generally divided into three stages: pre-event, incident and post-event control, with as many as 20 control objectives. The specific supervision content is complicated and trivial. If the director