拆模时间对混凝土结构的影响

来源 :商品混凝土 | 被引量 : 0次 | 上传用户:t19508409
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
混凝土施工中的模板,主要是起到定型和支撑的作用,同时兼具保温效果。但何时可以拆模,必须得具体部位具体分析。对于承重的模板(如底模),过早拆模时结构物强度较低,容易引发结构变形甚至垮塌,但是拆模时间过晚又会影响模板及支撑的周转效率。目前,对于承重的模板何时可以拆模,在相关的施工规范GB 50666-2011《混凝土结构工程施工规范》中有明确规定,主要参看的是实体强度,不同跨度以50%、75%或100% Concrete construction template, the main role is to play a role in stereotypes and support, while both insulation effect. But when you can disassemble, you must have specific parts of the specific analysis. For the load-bearing template (such as the bottom mold), premature demolition of the structure lower strength, easily lead to structural deformation or collapse, but the demolition of the mold too late will affect the template and support turnover efficiency. At present, when the load-bearing template can be removed from the mold, the relevant construction code GB 50666-2011 “Concrete Structure Engineering Construction Code,” clearly defined, the main reference is the physical strength of different span of 50%, 75% or 100 %
其他文献
小刺猬红红很爱美。一天,森林里举行选(xuǎn)美比赛,红红想:我要是去参加比赛,一定能得第一。于是她好好地打扮了自己,戴上红花,穿上美丽的裙(qún)子,出发去森林广场了。  路上,红红碰(pènɡ)到了老虎,老虎问她:“你要去哪里呀?”红红说:“我要去参加选美比赛。”老虎嘲(cháo)笑地说:“你全身长满刺,那么丑,参加选美比赛一定输。”红红生气地说:“那我就把刺都剪(jiǎn)掉。”  于是
结构化面试是面试方式中较为主流且较为稳定的面试方式。结构化面试评价体系主要包含以下几大构成要素:面试评价指标、面试题目及评价者结构。一般结构化面试的时间都基本控