十一、工程机械化施工工艺要求 (一)路面基层准备工作设计数量、使用机械。(略,参前) 工程应根据合同及监理工程师的指示认真地施工,施工管理应遵循共同规范第二章“工方工程”中各项标准。 1.整形及压实基层整备工作是用平地机对路基整形,用碎石压路机和轮胎压路机均匀碾压。在碾压时,应按KODAN A 1210标准使路基达到最大干燥密实度95%以上(现场测定)。另外,对路基的狭小地带应使
Eleventh, engineering mechanization construction process requirements (A) the amount of design preparation for pavement basic use of machinery. The project shall be conscientiously constructed according to the instructions of the contract and supervision engineer, and the construction management shall comply with the standards in Chapter Two of the Common Regulations, “Engineering Project”. 1. Plastic surgery and compaction grass-roots work is the use of grading machine roadbed plastic, gravel roller and tire roller uniform rolling. During rolling, the roadbed should be made to a maximum dry densification of 95% or more according to KODAN A 1210 standard (field measurement). In addition, the narrow roadbed should be made