本文结合工程实践,通过规划C7050超高塔吊附着体系的安拆与周转,解决了塔吊外附着时外框筒与核心筒协调施工的相关难题。
In this paper, with the engineering practice, through planning the installation and turnover of the C7050 super-tower crane attachment system, the problems related to the coordinated construction of the outer frame tube and the core tube when the tower crane is attached are solved.