Experimental implementations of continuous optical time domain Fourier transformation based on time lenses and optical orthogonal frequency-division multiplexing(OFDM) system are carried out.Such a system is verified through 100-km transmission of 10-Gb/s non-return-to-zero(NRZ) intensity-modulated direct-detection(IM-DD) without any dispersion compensation.The system’s bit error rate(BER) and power penalty are 10~(-12) and 4 dBm,respectively. Experimental implementations of continuous optical time domain Fourier transformation based on time lenses and optical orthogonal frequency-division multiplexing (OFDM) systems are carried out. Such a system is verified through 100-km transmission of 10-Gb / s non-return- to- zero (NRZ) intensity-modulated direct-detection (IM-DD) without any dispersion compensation.The system’s bit error rate (BER) and power penalty are 10 ~ (-12) and 4 dBm, respectively.
其他文献
本文介绍桐柏抽水蓄能电站机组进相试验的过程和结果,给出影响水轮发电机组静稳极限的条件和计算方法,分析影响机组进相深度的几个因素。
西龙池抽水蓄能电站首台机组蜗壳耐压试验时,由于局部发生漏水而被迫中止试验。经检查和分析,系顶盖和泄流环局部密封设计不合理所致。而后将所有试验设备拆除分解,将顶盖和
在招标承包制的施工中,水工建筑标段经常包括各种机、电设备的基础部件的埋设及设备安装。怎样搞好多专业、多工种的施工配合,满足施工安全、进度、质量要求。站在机、电安装
对山西西龙池下水库环库公路以上库岸边坡的锚索支护施工进行了总结,通过对施工前的各项准备、锚索试验、钻孔、锚索制作和安装、入孔、灌浆、孔口垫墩、张拉与锁定以及监测
本文针对西龙池抽水蓄能电站下水库工程高边坡稳定要求高、超欠挖技术要求高、安全防护困难等特点,结合生产性试验研究的成果,研究和确定出一系列适合本工程特点的控制爆破技
对沥青面板混凝土堆石坝上游坝坡的直线段、弧线段分别阐述了堆石坝的削坡控制,并分洒水和碾压两个阶段详细介绍上游坝坡碾压的整个施工过程。实践证明,所采用的施工工艺合理
在山西西龙池抽水蓄能电站下水库大坝料源调查及填筑当中,土工试验工作量相当的大。介绍运用VB或VBA的可视化环境使AutoCAD应用程序形成动态链接,从而实现颗粒分析试验的计算
在洞挖爆破中,采用导爆索连网实施光面爆破技术已相对成熟,但其操作繁琐且成本较高,结合施工实践,探讨了在围岩条件较好、开挖循环进尺适中等特定条件下,采用导爆管非电雷管
施工运渣交通洞工程是西龙池抽水蓄能电站前期工程的关键项目之一,具有工期紧、任务重的特点,工程能否按期完工关系到主体工程能否按期实施。介绍了工程的开挖与支护实施程序