自然条件恶劣,项目工程种类繁杂,工程工期紧,但合同一旦签订,必须运用所有可利用的资源去克服困难,才能获得成功。目标在前,如何打赢这场攻坚战?7万吨级OCEAN GEM号运煤船在菲律宾马利万斯重件码头停靠卸货,这意味着继菲律宾码头主体完成施工后,该码头已正式投入使用。马尼拉湾畔,中交第二航务工程局有限公司(以下简称“二航局”)的建设者们,以拼搏、奉献、智慧、汗水为弦,奏响了二航局在菲律宾国腾飞的乐章。项目起航菲律宾马利万斯电站码头包括一座7万吨的卸煤码头、一座3000吨级的重件码头、电厂取排水工程以及护岸、
Poor natural conditions, complex project types and tight construction schedules. However, once a contract has been signed, all available resources must be used to overcome difficulties in order to achieve success. How to Win This Tough Battle? The 70,000-tonne OCEAN GEM coal carrier docked at the Marys Victory Pier in the Philippines, which means that it has been put into operation after the construction of the main body of the Philippine Pier. . Manila Bay, in the second traffic Engineering Bureau Co., Ltd. (hereinafter referred to as “second navigation Bureau ”) builders, with hard work, dedication, wisdom, sweat string, played the second navigation board soar in the Philippines Music movement The project set sail Philippines Marivans power station terminal includes a 70,000 tons of unloading coal terminal, a 3,000-ton heavy wharf, power plant drainage and revetment,