索特集团矿山部Ⅱ采区采卤泵房DG45-80×12采卤泵起动后,电流一直降不下来,盘车转动灵活,检查电气设备一切正常,出水阀门也全部关闭。拆下泵轴承架及平衡室,发现平衡盘和平衡板之间间隙b比原装配间隙大得多。由于b增大后,轴向前审动量较大,叶轮和密封环摩擦增大,负荷加大。停车时叶轮复位,所以联轴器转动灵活。通常的检修方法是把平衡板和平衡盘都更新,笔者认为这样有点浪费。在此介绍3种修理方法,供参考(见附图)。
Saite Group Mining Division II mining area pump house DG45-80 × 12 mining pump start, the current has been down does not drop, turn the crank flexible, check all the normal electrical equipment, water valves are all closed. Remove the pump bearing frame and the balance chamber and found that the balance between the balance plate and balance plate b is much larger than the original assembly gap. Due to the increase of b, the axial forward motion is relatively large, the impeller and the seal ring friction increases, the load increases. The impeller is reset when parking, so the coupling is flexible. The usual method of repair is to balance the balance plate and balance plate are updated, I think this is a bit wasteful. Here are three kinds of repair methods for reference (see photo).