治理项目公示制,治理质量全达标

来源 :水土保持应用技术 | 被引量 : 0次 | 上传用户:xiwang1998
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
2006年1月,复州河流域纳入东北黑土区水土流失综合防治第一期工程。项目区水土流失面积112.04km2,占项目区总土地面积的45.31%。土壤侵蚀模数加权平均值为2 500 t/(km2.a)。水土流失形式主要为水力侵蚀,水力侵蚀主要表现为面蚀、线状侵蚀和沟状侵蚀。5 a规划治理水土流失面积109.8 km2,治理程度达98%。具体实施办法是:项目内容公示,激发出群众的能动作用;用工承诺公示,确保工程如期进行;产权管理公示,确保工程质量效益发挥。 January 2006, Fuzhou River basin into the northeastern black soil comprehensive prevention and control of the first phase of the project. The soil erosion area in the project area is 112.04km2, accounting for 45.31% of the total land area in the project area. Soil erosion modulus weighted average of 2 500 t / (km2.a). Water and soil loss is mainly in the form of hydraulic erosion. The main water erosion is surface erosion, linear erosion and trench erosion. 5 a Planning and management of soil erosion area of ​​109.8 km2, the degree of governance up to 98%. Specific implementation measures are: the content of the project is publicized to stimulate the initiative of the masses; labor promises publicity to ensure that the project on schedule; property management publicity to ensure the quality and efficiency of the project to play.
其他文献
任何一种税收,都会对社会、经济及人民生活水平产生重大的影响,通过分析其对就业和产品竞争力所产生的影响,并借鉴国外的实践得出,水资源保护税虽然有可能在短期内对就业和竞
预测浅层地面发生崩塌,通常运用崩塌实例统计分析法。随着计算机的发展,开始应用数理预测模型进行预测。但用模型全面表现复杂的自然现象,需在模型中增加参数,但增加了计算难度。