建设单位在招标过程中的造价控制

来源 :城市建设理论研究(电子版) | 被引量 : 0次 | 上传用户:weiyuhang99
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
工程项目的建设实施,具有建设周期长、建设投资大的特点,工程项目的相关企业投入建设资金之后,能否实现最终的建设目标,是每一个建筑企业所关注的重点,而在建设过程中,如何才能实现资金利用最大化,则是每个建设企业所关注的焦点。如今建筑行业,建筑工程招投标工作已经开展并得到认可,作为我国建筑行业进步的标志之一,建筑工程建设前进行招投标工作,有利于企业选择优质承包单位,便于实现建设企业经济效益的最大化。虽然目前我国招投标工作在实际操作中还存在一定问题,但在实际的工程造价控制中,积极发挥招投标工作的效果,促进我国建筑行业的发展。本文主要分析了建设单位在招标过程中的造价控制。
其他文献
The double-difference earthquake relocation algorithm (DD algorithm) has been applied to the accurate relocation of 10057 earthquakes in the central-western Chi
A pilot survey on a microbial mineral exploration method based on soil Bacillus cereus spore counts was carried out across three different gold mining regions,
Through lots of numerical simulations with FLAC3D, dynamic responses of slopes are comprehensively studied in this paper and the general regularities of the iso
Sounding and study on electrical structure of the crust and upper mantle within the eastern border region of Qinghai-Tibet Plateau by using the magnetotelluric
The concentrations of total suspended matter (TSM) and the compositions of organic stable carbon isotopes of TSM and bottom sediments were analyzed to study the
The early Precambrian khondalite series is widely distributed in the Jining-Zhuozi-Fengzhen- Liangcheng area, southeastern Inner Mongolia. The khondalite series
This paper describes an avialian bird from the Early Cretaceous Jiufotang Formation in Yixian county,western Liaoning, China, which is named as Shenzhouraptor s
To better understand the characteristics of the clay minerals in the southern Yellow Sea, the X-ray quantitative determinations have been carried out for the su
Microfossil assemblage and pollen zone characteristics in Core B10 recorded the history of environmental changes in the southern Yellow Sea since Würm Subinter
A regional climate-ecosystem model system is developed in this study. It overcomes the weakness in traditional one-way coupling models and enables detailed desc