一、问题的提出近年来杭州通信分枢纽在杭州铁路分局附近南北二处编组站增设了两个纵横制通信站:南星桥站和艮山门站。加上原有的杭州电务段大楼通信站和5551通信站共有四个通信站,每站均设有独立的电源设备。由于各通信站设立电源设备的维修人员少。加上通信站的市电经常停电等,给通信站的电源设备带来了较大威胁。为了加强各站电源设备的集中管理和集中控制。
First, the issue put forward In recent years, Hangzhou communications sub-hub in Hangzhou Railway Branch near the South and North Marshalling two marshalling stations added two vertical and horizontal communication station: South Star Bridge Station and Genshan Gate Station. With the original Hangzhou Telecom Building Communications Station and 5551 communications station a total of four communications stations, each station has its own power supply equipment. As the communication station to set up power equipment maintenance staff less. Coupled with the station’s power blackouts, etc., to the station’s power supply equipment has brought a greater threat. In order to strengthen the centralized management and centralized control of each station’s power equipment.