论文部分内容阅读
从上世纪50年代到今天,溪洛渡工程经历了50多年的构想。从规划、勘测、论证、立项审批、可研审查、技术评估到项目核准,国内外专家、各有关部门、高等院校、科研院所进行了大量的科学研究,模型试验。溪洛渡水电站严格执行了国家基本建设程序,是建立在翔实的科学研究和工程实践的基础上的科学论证的结果。溪洛渡水电站具备工程正式开工的各项条件。
From the 1950s to today, the Xiluodu project has undergone more than 50 years of conception. From the planning, survey, demonstration, project approval, feasibility study review, technical assessment to project approval, domestic and foreign experts, all relevant departments, institutions of higher learning, research institutes carried out a large number of scientific research and model tests. Xiluodu Hydropower Station has strictly implemented the national capital construction procedures and is the result of scientific argumentation based on detailed scientific research and engineering practice. Xiluodu hydropower station with the project started the conditions.