一、设计阶段造价控制的现状以及存在的问题(一)现行设计收费模式制约了工程造价控制我国目前主要有两种设计收费模式:第一,以设计概算额为基数,乘以国家规定的设计费率;第二,按工程类别分类,以建筑面积为基数,乘以相应的数值计算。这两种收费模式均只体现设计的量价关系,无法反映设计深度,体现优质优价的原则,使设计单位缺乏优化设计方案,进行工程造价控制的源动力。(二)使用单位参与设计深度不够,后期使
First, the design stage of the status of cost control and existing problems (A) the current design mode of toll control project cost control There are two main design charging modes: First, the design estimates for the base, multiplied by the state’s design Rates; Second, by project category, with building area as the base, multiplied by the corresponding numerical calculation. Both of these charging modes reflect only the relationship between the volume and the price of the design, fail to reflect the design depth and reflect the principle of high quality and low price. The design unit lacks the optimal motivation to control the project cost. (B) the use of units involved in the design depth is not enough to make late