非对称预应力两端张拉伸长量计算方法

来源 :河南水利与南水北调 | 被引量 : 0次 | 上传用户:a394665234
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
预应力施工是桥梁上部结构是桥梁上部结构施工的控制性关键工序,其施工质量直接影响到结构的使用性和安全性。文章从陕西省渭南市湭河入渭口堤防交通桥工程实际出发,探讨非对称预应力筋在两端张拉时伸长量的计算方法,并总结了影响该工程预应力筋理论伸长值的若干因素及其合理取值,通过改进计算方法提高计算的准确性,达到有效控制预应力施工的效果。 Prestressed construction is the bridge superstructure is the control of the bridge superstructure construction of the key processes, the construction quality of a direct impact on the structure of the use and safety. Based on the actual project of embankment traffic bridge at Weihekou in Weinan City, Shaanxi Province, this paper discusses the calculation method of the elongation of asymmetrical prestressing tendons at both ends of the embankment and summarizes the influence of the theoretical elongation value Of some factors and their reasonable value, by improving the calculation method to improve the accuracy of the calculation, to effectively control the effect of prestressed construction.
其他文献
水是农业发展的重要命脉。水利部门,已将农业节水视为水利工作的第一要义,注重对灌区进行节水改造,完善配套的设施建设。结合地方实情,引进和推广节水技术,为农业发展创造收
辉县市小型水库长期以来,大部分由乡镇、村负责或承包给个人管理,存在职责不明、责任不清、经费短缺等问题,大多位于深山区,每年防汛任务非常艰巨。为适应小型水库正常管理及
水利工程中堤坝的安全运行对于防洪防汛十分重要,是确保农业生产及人民生命财产安全的重要保障。为巩固水库的功能性与安全性,需要重视堤坝防渗加固和堤坝的管理工作;要及时
四港联动大道南延与省道102互通式立交暨京港澳高速薛店互通改建工程根据其特点和规模,结合施工地点的地质水文条件、气候条件、机械设备和材料供应等客观条件,运用先进技术,
南水北调,世纪工程,千秋伟业。提高经济效益、发挥社会效益、确保安全运行是南水北调工程建设管理者的责任和义务。南水北调中线工程渠道长,涉及膨胀土渠段多,在建设中采取了
边坡是具有倾斜面的土体,因土体表面倾斜,在重力及其它外力作用下,整个土体有从高处向低处滑动的趋势,土体滑动与边坡形状和土体类型有关。由粗颗粒土组成的边坡称为无粘性边
PDCA循环是爬楼梯上升式的循环,每转动一周,质量就提高一步,实物指标调查工作是一项政策性强、涉及面广、关系复杂、影响深远的工作,将PDCA管理理论和近年来开展的工程实物指
河北省水产技术推广站、河北省现代农业产业技术体系淡水养殖产业创新团队2017年上半年工作总结会于2017年7月12日在保定市召开,保定市农牧局刘学军副局长致辞,淡水创新团队
期刊
本文介绍了基于一款ARM处理器--S3C44B0X的以太网接口电路设计,并详细地阐述了在嵌入式操作系统μcLinux下网卡驱动的实现.
长期以来,我国大部分山区农民做饭、取暖主要以烧柴为主,砍掉了大量林木,这是造成生态环境恶化的一个重要原因。在水电资源比较丰富的山区农村,通过发展小水电代燃料,替代砍