论文部分内容阅读
结合东雷抽黄续建工程几座大型泵站厂房屋面施工的实际 ,介绍大型预制屋面的排水与渗漏问题及设计、施工方面应注意的事项 ,供类似工程参考。
In combination with the actual construction of the surface of several large-scale pumping station factories in Donglei Yanhuang Project, the problems of drainage and leakage of large-scale prefabricated roofs, and matters needing attention in the design and construction are introduced for reference of similar projects.