1工程概况杨家湾港口工程是三峡水利枢纽工程对外交通运输的专用港.集装箱码头是该港口主体工程,码头为61m散装水泥、粉煤炭集装箱和40t/许以下杂货通用码头,前沿总长251m,设有IO00t级连续泊位3个,设计年通过能力SO万t.码头采用高桩梁板结构,由全直立的桩基与梁板组成?
1 Project Overview Yangjiawan Port Project is the Three Gorges Water Control Project dedicated port of foreign transport. The container terminal is the main port of the project. The terminal is 61m bulk cement, coal powder container and 40t / g general cargo terminals below. The total length of the front is 251m. There are 3 continuous berths of 100t class. Wharf with high-pile board structure, composed of all erect pile and beam board composition?