近年来,随着山航机队规模的快速扩大,山航工程技术公司持续推进维修能力建设,于2010年6月取得CRJ200飞机10000FH/8300FC/36M(含)以下定检维修许可,2011年8月取得波音737NG的16000FH/12000FC/60M(含)以下定检维修许可。2012年9月,山航工程技术公司维修部顺利实施了波音737NG飞机的24P检工作,作为首次独立实施的波音737NG飞机高级别定检仅历时8天,有效保证了山航机队的飞机可用率。根据发展需要,山航工程技术公司先
In recent years, with the rapid expansion of the scale of the SAIC fleet, SAIC Engineering Corporation continued to promote the construction of its maintenance capacity. In June 2010, it obtained the following maintenance clearances for the CRJ200 aircraft of 10000FH / 8300FC / 36M (inclusive) Month made Boeing 737NG 16000FH / 12000FC / 60M (inclusive) following fixed inspection and maintenance clearance. In September 2012, the maintenance department of Shandong Airlines Engineering Technology Co., Ltd. smoothly implemented the 24P inspection of Boeing 737NG aircraft. As the first independent high-level inspection of Boeing 737NG aircraft took only 8 days, effectively ensuring the availability of the aircraft of Shandong Airlines fleet rate. According to the development needs, Shanhang Engineering and Technology Company first