论文部分内容阅读
2012年1月10日,南非Transnet铁路运输公司(TRE)在其下属的Koedoespoor工厂与GE南非技术公司(Gesat)举行了追加订购43台C30ACi43型内燃机车的签字仪式。在完成首批订购的100台机车的交付之后,此次追加订购的2500kW Co-Co机车将从2012年第二季度开始生产。首批10台43型机车是在GE
On January 10, 2012, Transnet Railroad (TRE) of South Africa held a signing ceremony for 43 additional C30ACi43 diesel locomotives with GE South Africa Technology Company (Gesat) at its subsidiary Koedoespoor Plant. The 2500kW Co-Co locomotive to be ordered additionally will start production in the second quarter of 2012 after the delivery of the first batch of 100 locomotives has been completed. The first 10 Taiwan 43 locomotives are at GE