Annual Report of HWRR in 2015

来源 :Annual Report of China Institute of Atomic Energy | 被引量 : 0次 | 上传用户:a9249228
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 Operation and maintenance According to HWRR operation and maintenance plan in 2015,the following activities had been implemented:examination and maintenance of the exhausting fans and heavy water leakage monitoring system in heavy water storage rooms;maintenance of power supply systems and control 1 Operation and maintenance According to HWRR operation and maintenance plan in 2015, the following activities had been implemented: examination and maintenance of the exhausting fans and heavy water leakage monitoring system in heavy water storage rooms; maintenance of power supply systems and control
其他文献
据新华网消息,世界银行10月6日在新加坡发布《东亚经济半年报》,将中国2014年经济增长预期由之前的7.6%调低至7.4%,但强调中国政府的改革措施将使经济走上更可持续的发展轨道
10月25日22时,核燃料后处理放化实验设施首次热试验证顺利完成;12月26日上午6时,第二轮热试验证顺利完成。至此,辐照元件后处理全流程通过了台架热试验证,院“十二五”后处理
2月6日,串列升级工程在线同位素分离器系统与HI-13串列加速器首次联合调试成功,串列加速器高能端法拉第筒束流达到800 ep A。本次联合调试由ISOL靶源系统产生并引出了39K+离
里约奥约会中国男篮五战皆墨,在全国各界声讨男篮的糟糕表现和批评溃败的同时,不禁对中国男篮的表现很怜惜,冷静之余开始客观对男篮在奥运的征程和结果作出分析,通过分析部分
In 2015,the 5SDH-2pelletron accelerator has been in good condition,and met the need of science study projects and civil product projects according to operation
为了尽可能地降低纤维染色过程中造成的污染,高效快速地达到纤维染色的目的,利用木质素对聚丙烯腈(PAN)纤维进行改性,并对改性纤维的色牢度以及相关热湿性能进行了研究.结果
HI-13tandem accelerator was running well in 2015,and some good work was doing well in maintenance and development.This year the machine has been operated for 4
在2013年召开的中央经济工作会议提出:要全面认识持续健康发展和生产总值(GDP)增长的关系,不能把发展简单化为增加生产总值,抓住机遇保持国内生产总值合理增长、推进经济结构
高压脉冲调制器的RD回路与脉冲变压器初级并联,反峰回路与人工线并联。在加速器运行过程中,RD回路和反峰回路的功率电阻温度偏高,均超过100℃。虽能够正常工作,但高温会影响
The airborne discharge station for radioactive purity liquid waste water is officially put into operation in 2010,and it is the first facility for treated radio