近几年,#5、#6、#7、#8机组的热力系统进了数次不同程度的优化改造,从300MW提高到330MW,极大了机组的出力效果,并给公司带来了可观的经济收益。通过利用300MW机组设备特点以及对热力系统的优化改造,不仅起到节约用电的效果,更降低了工质的浪费与机组的损耗。本文将对机组在进行热力系统改造之后,在运行方式等方面做出的优化与调整做出论述与分析,以供参考。
In recent years, the heat systems of # 5, # 6, # 7 and # 8 have undergone several different degrees of optimization and improvement, from 300MW to 330MW, which have greatly boosted the output of the unit and brought considerable benefits to the company The economic benefits. By taking advantage of the equipment characteristics of 300MW unit and the optimization and modification of the thermal system, it not only plays an effect of saving electricity but also reduces the waste of working fluid and the loss of the unit. This article will be on the unit after the transformation of the thermal system, the operation mode and so on to make the optimization and adjustment of the discussion and analysis for reference.