论文部分内容阅读
1工程概况三道弯水电站位于黑河市爱辉区境内的法别拉河中游,该电站为一混合开发的水利枢纽工程。坝址位于马厂乡三道湾子村上游40km,距上游梯级象山水电站35km,距黑河市城区49.ohm。该电站是一座以发电、防洪为主,兼顾养鱼等综合利用的水利枢纽工程。坝址上控制流域面积2
1 Project Overview The Three-bend Water Power Station is located in the middle of the Fabe River in Aihui District, Heihe City. The power station is a mixed-use water conservancy project. The dam site is located 40 km upstream of Sandaowanzi Village, Machang Township, 35km away from the upstream cascade Xiangshan Hydropower Station and 49km away from downtown Heihe. ohm. The power plant is a water power generation project, flood control, taking into account the comprehensive utilization of fish and other water control projects. Dam site control basin area 2