论文部分内容阅读
中国电力投资集团2010年1月21日宣布,中国首个万吨级燃煤电厂CO2捕集装置日前在重庆合川电厂正式投运。该装置每年可处理燃煤产生的烟气5000×104m3,从中捕集1×104t高纯度CO2。这个由中国电力投资集团旗下远达环保工程公司研发建设的碳捕集装置,是全球已投运的为数不多的万吨
China Power Investment Group announced on January 21, 2010 that China’s first 10,000-ton coal-fired power plant CO2 capture plant has been put into operation at Chongqing Hechuan Power Plant recently. The device can handle 5000 × 104m3 of flue gas generated from coal burning every year, capturing 1 × 104t of high-purity CO2 from it. This carbon capture plant, developed by China Environmental Protection Engineering Co., Ltd., a subsidiary of China Power Investment Group, is one of the few million tons that has been put into operation worldwide