香港安达臣道石矿场用地开发项目位于东九龙排水系统最上游,并位于东九龙排水总体规划研究区内。东九龙排水计划提出整体排水改善工程,以配合东九龙地区的未来发展。本研究采用Info Works ICM(版本5.5)模拟软件,在东九龙排水模型的基础上模拟拟建的排水系统,对香港安达臣道石矿场用地发展项目对现状雨水系统的影响进行评估,并提出可行的缓解方案。一、现状排水系统评估《东九龙可行性研究排水总体规划检讨》评估了上游地
The development site for the Anderson Road quarry site in Hong Kong is located at the uppermost stream of the drainage system in East Kowloon and is located in the East Kowloon drainage overall planning study area. The East Kowloon Drainage Scheme proposes an overall drainage improvement project to tie in with the future development of the East Kowloon area. In this study, Info Works ICM (version 5.5) simulation software was used to simulate the proposed drainage system based on the East Kowloon drainage model to assess the impact of the development of the site of Anderson Road quarry in Hong Kong on the current rainwater system. Feasible mitigation options. I. Status quo drainage system assessment The “Kowloon East Feasibility Study Drainage Master Plan Review” assessed the upstream